A contractor will be paving Buckner Lane on the campus of ÇàÇà²ÝÊÓƵ beginning at 8 a.m. on Friday [Aug. 21], as illustrated by the accompanying map.
One lane of the roadway will be closed at a time as each section is paved. The work is expected to take most of the day, and drivers are encouraged to seek an alternate route if possible.
Thank you for your cooperation during this necessary roadwork.